Who pays for the sewer lateral in Woodside, CA

Which part of the pipe is yours

If something’s wrong

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    Town of Woodside
    What it covers:
    uncovering, connecting to, altering or disturbing a public sewer

    Woodside Municipal Code section 51.046(A) provides that "no unauthorized person shall uncover, make any connection with or openings into, nor shall they use, alter or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the Town and paying all fees and connection charges required by this Code and the Town schedule of fees and charges". Section 51.046(G) adds that the work is inspected before it is closed: "all building sewers and the connection of such sewers to the Town wastewater facilities shall be inspected and tested prior to the time physical connection is made", with the applicant giving "at least 48 hours advance notice to the Town's engineering representative that the building sewer is ready for inspection".

The repair rule in full, with its sources

Buying or selling?

No rule on file here is specific to selling or buying; that does not mean none exists.

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Woodside about the sewer lateral.

Woodside: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

A cleanout at the property line decides this one. The Town maintains the run between that cleanout and the public sewer where a conforming one has been installed; without it the owner has the whole length, building to main. Every building sewer in Woodside is required to have one.

Woodside
The property owner

What decides which applies

Sources

Woodside Municipal Code section 51.046(E), Maintenance of building sewers

Checked

What the rules say

Most relevant if you are repairing or replacing the pipe

  • Before work on the pipePermit
    Who issues it:
    Town of Woodside
    What it covers:
    uncovering, connecting to, altering or disturbing a public sewer

    Woodside Municipal Code section 51.046(A) provides that "no unauthorized person shall uncover, make any connection with or openings into, nor shall they use, alter or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the Town and paying all fees and connection charges required by this Code and the Town schedule of fees and charges". Section 51.046(G) adds that the work is inspected before it is closed: "all building sewers and the connection of such sewers to the Town wastewater facilities shall be inspected and tested prior to the time physical connection is made", with the applicant giving "at least 48 hours advance notice to the Town's engineering representative that the building sewer is ready for inspection".

    What to do: Ask the Town for the connection permit fee and any charges from the schedule before accepting a quotation, and check that the quotation allows for the 48 hours' notice and the inspection before backfill. If the property has no cleanout at the property line, ask what installing one would cost at the same time - section 51.046(E) makes that cleanout the difference between the Town maintaining the run to the main and you maintaining it.

    In force since · Checked

    Woodside Municipal Code section 51.046, Building sewers and connections

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.

Who governs and serves this area

Jurisdiction
Woodside (municipality)
Sewer service

Look up a specific address

This page describes what applies to properties in Woodside in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address