Who pays for the sewer lateral in Martinez, CA

Which part of the pipe is yours

  • Sewer lateral

    Yours all the way to the main, including the fitting where it joins — if certain conditions are met

    Why, and what to do

If something’s wrong

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    City of Martinez City Engineer
    What it covers:
    any encroachment within upon over or under a right-of-way in the city including excavating it or placing a pipeline under it

    Martinez Municipal Code section 12.04.050 makes it unlawful for any person, "without first obtaining a written permit, to encroach or to make or cause to be made any encroachment of any nature whatever within, upon, over or under the limits of any right-of-way in the City", and names placing "on, over or under such right-of-way any pipeline, conduit or other fixture" among the acts covered; section 12.08.010 counts excavating or disturbing the right-of-way as an encroachment. The permit is issued by the City Engineer. Both sanitary districts serving Martinez put the lateral under the street on the owner, so this is the City permit an owner needs to dig to it. Mt. View Sanitary District tells contractors the same thing: "The contractor is also responsible to obtain encroachment permits with the City of Martinez or Contra Costa County prior to performing work within public right-of-way".

The repair rule in full, with its sources

No rule on file here is specific to selling, buying, remodelling or adding a unit; that does not mean none exists.

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Martinez about the sewer lateral.

Martinez: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

Two sanitary districts collect Martinez's sewage, each in part of the city, and the City's own code defines the public sewer by naming them. Central Contra Costa Sanitary District serves "portions of Martinez", and Mt. View Sanitary District serves "the northeasterly portion of the City of Martinez". On the lateral they agree: it is private, and the owner is responsible for all of it, from the building to the district's main in the street and including the fitting where it joins the main.

The property owner

What decides which applies

Sources

Central Contra Costa Sanitary District Code of Laws, Title 9, Sewers

Checked

What the rules say

Most relevant if you are repairing or replacing the pipe

  • Before work on the pipePermit
    Who issues it:
    City of Martinez City Engineer
    What it covers:
    any encroachment within upon over or under a right-of-way in the city including excavating it or placing a pipeline under it

    Martinez Municipal Code section 12.04.050 makes it unlawful for any person, "without first obtaining a written permit, to encroach or to make or cause to be made any encroachment of any nature whatever within, upon, over or under the limits of any right-of-way in the City", and names placing "on, over or under such right-of-way any pipeline, conduit or other fixture" among the acts covered; section 12.08.010 counts excavating or disturbing the right-of-way as an encroachment. The permit is issued by the City Engineer. Both sanitary districts serving Martinez put the lateral under the street on the owner, so this is the City permit an owner needs to dig to it. Mt. View Sanitary District tells contractors the same thing: "The contractor is also responsible to obtain encroachment permits with the City of Martinez or Contra Costa County prior to performing work within public right-of-way".

    What to do: First confirm which district serves the address - Central San or Mt. View Sanitary District - and get that district's sewer permit. Then apply to the Martinez City Engineer for an encroachment permit with the district's consent attached, a certificate of insurance and the deposit the engineer sets. Tell the engineer when excavation will start and when the work is finished. If a blocked lateral cannot wait, call the engineer's office (or the police out of hours) before digging and apply within ten calendar days.

    Checked

    Martinez Municipal Code Title 12, City Real Property, Division I, Encroachments

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.

Who governs and serves this area

Jurisdiction
Martinez (municipality)
Sewer service

Look up a specific address

This page describes what applies to properties in Martinez in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address