Who pays for the sewer lateral in Gardena, CA

Which part of the pipe is yours

If something’s wrong

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    City of Gardena, Engineering Division
    What it covers:
    work on house laterals under a sewer permit, and excavation in the street under a separate encroachment permit from the same division

    The City of Gardena states that "any construction or activity involving the construction, repair, or alteration of public sewers, main line sewers, house laterals, or sewage pumping plants requires a permit from the Engineering Division of the Public Works Department". Separately, any "excavation or encroachment in any street, curb, gutter, sidewalk, driveway" also "is required to obtain an encroachment permit from the Engineering Division of the Public Works Department". A lateral replacement that reaches the main is both.

The repair rule in full, with its sources

No rule on file here is specific to selling, buying, remodelling or adding a unit; that does not mean none exists.

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Gardena about the sewer lateral.

Gardena: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

The property owner maintains the sewer lateral, and in Gardena the code's own definition puts the run under the road on them explicitly: a "house lateral" here means the pipe from the property line to its connection with the main sewer. The City maintains the main and claims no part of the lateral.

The property owner

What else is worth knowing

Sources

City of Gardena Municipal Code chapter 13.04, the sanitary sewer law

Checked

What the rules say

Most relevant if you are remodelling or adding a unit

No rule on file here is specific to remodelling or adding a unit; that does not mean none exists.

Also in force here

  • Before work on the pipePermit
    Who issues it:
    City of Gardena, Engineering Division
    What it covers:
    work on house laterals under a sewer permit, and excavation in the street under a separate encroachment permit from the same division

    The City of Gardena states that "any construction or activity involving the construction, repair, or alteration of public sewers, main line sewers, house laterals, or sewage pumping plants requires a permit from the Engineering Division of the Public Works Department". Separately, any "excavation or encroachment in any street, curb, gutter, sidewalk, driveway" also "is required to obtain an encroachment permit from the Engineering Division of the Public Works Department". A lateral replacement that reaches the main is both.

    What to do: Ask the Engineering Division for both at once - the sewer permit for the work on the lateral and the encroachment permit for the excavation - since one department issues them and a single conversation can settle both. Ask for the fees at the same time; the City links a fee schedule rather than publishing figures on either page.

    Checked

    City of Gardena, Public Works - Sewer Permit

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.
  • No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.

Who governs and serves this area

Jurisdiction
Gardena (municipality)
Sewer service
No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.

Look up a specific address

This page describes what applies to properties in Gardena in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address