Skip to main content
BelowGrid

Who pays for the sewer lateral in Emeryville, CA

Which part of the pipe is yours

If something’s wrong

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    City of Emeryville
    What it covers:
    any repair, replacement or abandonment of a private lateral, and any verification test

    The City of Emeryville states that "a permit is required for any repair, replacement, or abandonment, or for a verification test on a private sewer lateral", and opens its guidance with a safety warning: "before any work is performed on your sewer, please call PG&E ... to determine if a small-diameter gas pipeline crosses through your sewer lateral". A City Public Works Inspector "is required to come for all sewer lateral work" and "usually comes a total of five times for each project"; the EBMUD verification test "must be witnessed by a representative from EBMUD and the City PW Inspector" and "cannot be performed until after the City PW Inspector has completed the third call". The City adds that "in most cases, a private sewer lateral will not pass the verification test unless some repair or replacement is performed". Two things the Municipal Code adds are worth having before you apply. Clearing a blockage is outside all of this: section 7-8.202 provides that "no sewer lateral permit shall be required for the clearance of sewer stoppages in a building sewer lateral". And where a permit IS needed, it is the only one - issuing it "shall satisfy the requirements of Chapter 2 of Title 7 regarding excavations and encroachments in the public right-of-way", so there is no separate encroachment permit to apply for. The application has to be made in person by the owner's licensed contractor.

The repair rule in full, with its sources

Buying or selling?

  • When you sell · Certificate · East Bay Regional Private Sewer Lateral Program

    A Compliance Certificate is required to close escrow when a property is sold or transferred. A certificate is valid twenty years after a complete replacement and seven years otherwise.

  • When you sell · Extension available · East Bay Regional Private Sewer Lateral Program

    A 180-day extension is available when buying or selling: if a Compliance Certificate cannot be obtained before title transfers, a Time Extension Certificate allows 180 days for the work, and is valid only when returned with a $4,500 deposit at title transfer.

The sale rules in full, with their sources

Planning work?

  • When you remodel · Certificate · East Bay Regional Private Sewer Lateral Program

    Where a permit is sought for new construction or for remodelling costing more than $100,000, a Compliance Certificate is required before the final permit or approval is obtained.

The remodelling rule in full, with its sources

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Emeryville about the sewer lateral.

Emeryville: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

The whole pipe is yours, and the City says so in its definitions rather than leaving it to be worked out. The building sewer lateral runs from two feet outside the building "up to and including the connection to the public sewer", and the code states that it "is comprised of the upper sewer lateral and lower sewer lateral and is the sole responsibility of the property owner". That includes the run under the pavement and the road, and the fitting where it meets the main.

The property owner

What else is worth knowing

Sources

Emeryville Municipal Code Title 7 chapter 8, Wastewater Collection System

Checked

What the rules say

Some of these requirements are issued by East Bay Regional Private Sewer Lateral Program rather than by Emeryville.

Most relevant if you have a backup or blockage

No rule on file here is specific to a backup or blockage; that does not mean none exists.

Also in force here

  • Before work on the pipePermit
    Who issues it:
    City of Emeryville
    What it covers:
    any repair, replacement or abandonment of a private lateral, and any verification test

    The City of Emeryville states that "a permit is required for any repair, replacement, or abandonment, or for a verification test on a private sewer lateral", and opens its guidance with a safety warning: "before any work is performed on your sewer, please call PG&E ... to determine if a small-diameter gas pipeline crosses through your sewer lateral". A City Public Works Inspector "is required to come for all sewer lateral work" and "usually comes a total of five times for each project"; the EBMUD verification test "must be witnessed by a representative from EBMUD and the City PW Inspector" and "cannot be performed until after the City PW Inspector has completed the third call". The City adds that "in most cases, a private sewer lateral will not pass the verification test unless some repair or replacement is performed". Two things the Municipal Code adds are worth having before you apply. Clearing a blockage is outside all of this: section 7-8.202 provides that "no sewer lateral permit shall be required for the clearance of sewer stoppages in a building sewer lateral". And where a permit IS needed, it is the only one - issuing it "shall satisfy the requirements of Chapter 2 of Title 7 regarding excavations and encroachments in the public right-of-way", so there is no separate encroachment permit to apply for. The application has to be made in person by the owner's licensed contractor.

    What to do: Ring PG&E on the number the City publishes before any work starts, and before any attempt to clear a blockage. Then plan for the sequence rather than a single visit: the City's inspector attends throughout, the EBMUD verification test cannot happen until that inspector's third call, and both agencies must witness it. Ask whether either exemption applies - EBMUD's for a lateral fully replaced within ten years on a signed final building permit, or the City's where it replaced the lower lateral itself during a rehabilitation project, which still leaves the upper lateral to be tested.

    Checked

    City of Emeryville, Permits
  • When you remodelCertificate

    Where a permit is sought for new construction or for remodelling costing more than $100,000, a Compliance Certificate is required before the final permit or approval is obtained.

    What to do: Check whether a current certificate or exemption already covers this property through the East Bay Regional Private Sewer Lateral Program before planning the permit timeline around an inspection.

    Issued by East Bay Regional Private Sewer Lateral Program · In force since · Checked

    Consolidated Regional Private Sewer Lateral Ordinance, effective 24 May 2019
  • When you sellCertificate

    A Compliance Certificate is required to close escrow when a property is sold or transferred. A certificate is valid twenty years after a complete replacement and seven years otherwise.

    What to do: Check whether a current certificate or exemption already covers this property through the East Bay Regional Private Sewer Lateral Program before arranging an inspection.

    Issued by East Bay Regional Private Sewer Lateral Program · In force since · Checked

    Consolidated Regional Private Sewer Lateral Ordinance, effective May 24, 2019
  • When you sellExtension available

    A 180-day extension is available when buying or selling: if a Compliance Certificate cannot be obtained before title transfers, a Time Extension Certificate allows 180 days for the work, and is valid only when returned with a $4,500 deposit at title transfer.

    What to do: If the lateral cannot be certified before completion, ask the East Bay Regional Private Sewer Lateral Program about a Time Extension Certificate, and agree in writing which party will receive the $4,500 refund.

    Issued by East Bay Regional Private Sewer Lateral Program · In force since · Checked

    East Bay Regional Private Sewer Lateral Program

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.
  • No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.

Who governs and serves this area

Jurisdiction
Emeryville (municipality)
Sewer service
No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.

Look up a specific address

This page describes what applies to properties in Emeryville in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address