Who pays for the sewer lateral in Edgewood, WA

Which part of the pipe is yours

  • Sewer lateral

    Yours from your property line to your building — if certain conditions are met

    Why, and what to do

If something’s wrong

If a repair needs a permit or an inspection

No rule on file here is specific to a repair; that does not mean none exists.

Buying or selling?

No rule on file here is specific to selling or buying; that does not mean none exists.

Planning work?

  • Before work on the pipe · Permit

    Who issues it:
    City of Edgewood
    What it covers:
    side sewer construction and connection to the side sewer

    Edgewood Municipal Code section 11.45.060 provides that "Side sewer construction and/or connection to the side sewer shall not begin until all of the following permits have been obtained": a connection permit and agreement, and a right-of-way permit for construction.

The remodelling rule in full, with its sources

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Edgewood about the sewer lateral.

Edgewood: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

In Edgewood the City owns and maintains the side sewer, the length between the City's sewer main and the right-of-way or easement line, once it has accepted it; the owner owns and maintains the building sewer on the property. Section 11.45.130(A) of the Edgewood Municipal Code provides that "The owner of the property served by a building sewer shall construct, pay for, own, operate and maintain the building sewer."

Edgewood
The property owner

What decides which applies

Sources

Edgewood Municipal Code section 11.45.010

Checked

What the rules say

Most relevant if you are selling or buying

No rule on file here is specific to selling or buying; that does not mean none exists.

Also in force here

  • Before work on the pipePermit
    Who issues it:
    City of Edgewood
    What it covers:
    side sewer construction and connection to the side sewer

    Edgewood Municipal Code section 11.45.060 provides that "Side sewer construction and/or connection to the side sewer shall not begin until all of the following permits have been obtained": a connection permit and agreement, and a right-of-way permit for construction.

    What to do: Before building a side sewer or connecting to the side sewer, get a connection permit and agreement (from the City, or from the receiving jurisdiction where it administers the permit on the City's behalf) and a right-of-way permit for construction.

    In force since · Checked

    Edgewood Municipal Code section 11.45.060, Permits required (Ord. 26-0709, 2026)

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.
  • No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.

Who governs and serves this area

Jurisdiction
Edgewood (municipality)
Sewer service
No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.