Who pays for the sewer lateral in Santa Monica, CA

Which part of the pipe is yours

If something’s wrong

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    City of Santa Monica, the Street Superintendent issuing and the Utilities Division making the connection
    What it covers:
    making, constructing, altering or repairing any house connection sewer or any portion of one, with clearing a stoppage exempt unless pipe is replaced or a street, sidewalk or sewer easement is excavated

    Santa Monica requires a written permit from the Street Superintendent before anyone may "make, construct, alter or repair any house connection sewer ... or any portion of any such sewer or storm drain connection". The City's own page puts it simply: "a permit is required to construct, alter, or repair any house connection sewer". Clearing a blockage is exempt - "except when it is necessary to replace any part or all of such sewer connection or to excavate in any street or sidewalk or sewer easement in connection therewith". And the connection to the main is not your contractor's to make: your contractor "shall excavate to the sewer or storm drain at the point where the connection is to be made, and wastewater maintenance forces of the Utilities Division shall then cut the required hole in the sewer or storm drain and install the sewer saddle furnished by the City", for a separate tapping or saddling fee.

The repair rule in full, with its sources

No rule on file here is specific to selling, buying, remodelling or adding a unit; that does not mean none exists.

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Santa Monica about the sewer lateral.

Santa Monica: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

The owner keeps the pipe from the property to the main, and in Santa Monica the code's own term for it names the part in the road: a "house connection sewer" is the pipe "constructed in a street, alley, walk or other public place or in a sewer easement". The City puts it plainly on its permit page - owners are responsible "from their property to the City's sewer main in the City street or alley".

The property owner

What else is worth knowing

Sources

City of Santa Monica, How to get a Sewer Permit

Checked

What the rules say

Most relevant if you have a backup or blockage

No rule on file here is specific to a backup or blockage; that does not mean none exists.

Also in force here

  • Before work on the pipePermit
    Who issues it:
    City of Santa Monica, the Street Superintendent issuing and the Utilities Division making the connection
    What it covers:
    making, constructing, altering or repairing any house connection sewer or any portion of one, with clearing a stoppage exempt unless pipe is replaced or a street, sidewalk or sewer easement is excavated

    Santa Monica requires a written permit from the Street Superintendent before anyone may "make, construct, alter or repair any house connection sewer ... or any portion of any such sewer or storm drain connection". The City's own page puts it simply: "a permit is required to construct, alter, or repair any house connection sewer". Clearing a blockage is exempt - "except when it is necessary to replace any part or all of such sewer connection or to excavate in any street or sidewalk or sewer easement in connection therewith". And the connection to the main is not your contractor's to make: your contractor "shall excavate to the sewer or storm drain at the point where the connection is to be made, and wastewater maintenance forces of the Utilities Division shall then cut the required hole in the sewer or storm drain and install the sewer saddle furnished by the City", for a separate tapping or saddling fee.

    What to do: Apply to the Street Superintendent before any work beyond clearing a blockage, and ask two questions when you do. Ask what the tapping or saddling fee is and how City crews are scheduled, so your contractor's trench is not open waiting for them. And if you are connecting to a sewer house connection the City built, ask what the City's records show it cost - section 7.04.590 makes that amount payable before the permit issues. Applications go to [email protected]. If your lateral serves two lots, raise it early: the code allows two lots on one connection but only one per connection during new construction or remodels.

    Checked

    City of Santa Monica, How to get a Sewer Permit

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.
  • No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.

Who governs and serves this area

Jurisdiction
Santa Monica (municipality)
Sewer service
No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.