Who pays for the sewer lateral in Palos Verdes Estates, CA
Which part of the pipe is yours
Yours all the way to the main under the road
Why, and what to doYours from the meter to your building
Why, and what to do
If something’s wrong
If a repair needs a permit or an inspection
- Who issues it:
- City of Palos Verdes Estates - the public works director for the street, the city engineer for the sewer
- What it covers:
- excavating a street, and separately constructing, using or altering a house lateral
Two permits reach the same trench here. Palos Verdes Estates Municipal Code section 12.12.020 provides that "no person shall make or cause to be made any excavation, cut or fill in or under the surface of any street or other public place in the city or construct, alter, or reconstruct any improvements thereon or therein without first having obtained from the public works director a permit". And the sanitary sewer ordinance the City adopted is more specific still: Los Angeles County Code section 20.32.010 bars any person from doing or causing to be done, constructing, using or altering "any public sewer, main-line sewer, house lateral, sewage pumping plant, water pollution control plant, or other similar appurtenance ... without first obtaining a sewer construction permit", which section 13.14.020 reads as a permit from the city engineer.
Who to call first about the sewer lateral
Palos Verdes Estates: official site(opens in a new tab)The documents this answer is built on
Who is responsible for which part
Palos Verdes Estates writes no sewer ownership rule of its own either. Section 13.14.010 of its municipal code adopts "Title 20, Utilities, Division 2, Sanitary Sewers and Industrial Waste, of the Los Angeles County Code as amended and in effect on January 2, 2020" as the City's sanitary sewer and industrial waste ordinance, and section 13.14.020 renames the parties in it - "County engineer" means the city engineer, "County of Los Angeles" means the city of Palos Verdes Estates. Inside that adopted division, section 20.24.080 provides that all house laterals "shall be maintained by the owner of the property served in a safe and sanitary condition", and section 20.20.130 defines a "house lateral" as "that part of the sewer piping within the street or right-of-way which extends from the property or sewer right-of-way line to a construction with the main-line sewer". The length the City's ordinance puts on the owner is the length under the road.
- The property owner
- The run under the street, named as such. Section 20.24.080 assigns house laterals to "the owner of the property served", and section 20.20.130 puts a house lateral in the street, from the property line to the main-line sewer. Section 20.20.220 defines that main-line sewer independently - one "in which changes in alignment and grade occur only at manholes", and such sewers "are generally eight inches or more in diameter" - so the owner's length ends where that pipe begins. The City replaces the adopted code's meaning of "public sewer" with "all sanitary sewers and appurtenances thereto lying within streets or easements dedicated to the city, which are under the sole jurisdiction of the city", and the boundary is unaffected: a house lateral ends at the main-line sewer whatever "public sewer" is taken to cover.
What else is worth knowing
Sources
Palos Verdes Estates Municipal Code chapter 13.14, Sanitary Sewers and Industrial WasteWhat the rules say
Most relevant if you have received a notice from the city or district
No rule on file here is specific to a notice from the city or district; that does not mean none exists.
Also in force here
- Who issues it:
- City of Palos Verdes Estates - the public works director for the street, the city engineer for the sewer
- What it covers:
- excavating a street, and separately constructing, using or altering a house lateral
Two permits reach the same trench here. Palos Verdes Estates Municipal Code section 12.12.020 provides that "no person shall make or cause to be made any excavation, cut or fill in or under the surface of any street or other public place in the city or construct, alter, or reconstruct any improvements thereon or therein without first having obtained from the public works director a permit". And the sanitary sewer ordinance the City adopted is more specific still: Los Angeles County Code section 20.32.010 bars any person from doing or causing to be done, constructing, using or altering "any public sewer, main-line sewer, house lateral, sewage pumping plant, water pollution control plant, or other similar appurtenance ... without first obtaining a sewer construction permit", which section 13.14.020 reads as a permit from the city engineer.
What to do: Ask the public works department for the trench cut cost recovery fee and the deposits set by council resolution before accepting a quotation, and ask the city engineer separately about the sewer construction permit - they are two permits and one of them is not from the same counter. Settle with the contractor in writing who carries the two-year obligation on the road surface. If the work is a genuine emergency, section 12.12.050 allows the excavation first, but read it carefully: it must have been impractical to get a permit, the public works director must be notified and a permit obtained as soon as practicable, and the section says it "shall be strictly construed against the person claiming the benefit hereof", with the burden of proving the emergency on the person who dug.
Palos Verdes Estates Municipal Code chapter 12.12, ExcavationsWhy this matters
The second of those names the house lateral and names altering it, so a repair is covered and not only a new connection. Three conditions follow the work rather than precede it. Section 12.12.140(B) provides that "permittees shall maintain the surface of the street or other public property in good condition for a period of two years following the date of issuance of the permit", and 12.12.140(C) adds that where the street later needs repair "due to causes attributable to an excavation, the permittee shall make such repairs at no cost to the city" - a two-year exposure on a patch, which belongs in the conversation with a contractor about who carries it. The money is not published: section 12.12.030 has the application carry "a trench cut cost recovery fee as determined by resolution of the city council" and "the deposits and fees as required by resolution of the city council", so the amounts have to be asked for. And working without the permit has its own price - county section 20.32.122, also within the text this City adopted, requires "an investigation fee in the amount determined by the County Engineer to be necessary to recover all costs incurred in investigating the failure to obtain a sewer construction permit", waivable at the engineer's discretion for a genuine emergency.
What this page cannot tell you
- No assistance or grant programme has been reviewed for this jurisdiction yet.
- No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.
Who governs and serves this area
- Jurisdiction
- Palos Verdes Estates (municipality)
- Sewer service
- No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.
How this compares to neighbouring cities
2 of the 8 nearest cities draw the line somewhere else. Each authority publishes only its own rule.
Your other pipe: the water service line
The drinking water line coming into your property is a separate pipe, run by a separate authority, and who is responsible for it is decided separately. Your sewer lateral is yours to the main; your water line stops being yours at the meter.
Who owns the water service line in Palos Verdes EstatesNearby cities and further reading
Look up a specific address
This page describes what applies to properties in Palos Verdes Estates in general. To see which authorities serve one address, and what records exist for it, search for it.
Search for an address