Who pays for the sewer lateral in Palos Verdes Estates, CA

Which part of the pipe is yours

If something’s wrong

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    City of Palos Verdes Estates - the public works director for the street, the city engineer for the sewer
    What it covers:
    excavating a street, and separately constructing, using or altering a house lateral

    Two permits reach the same trench here. Palos Verdes Estates Municipal Code section 12.12.020 provides that "no person shall make or cause to be made any excavation, cut or fill in or under the surface of any street or other public place in the city or construct, alter, or reconstruct any improvements thereon or therein without first having obtained from the public works director a permit". And the sanitary sewer ordinance the City adopted is more specific still: Los Angeles County Code section 20.32.010 bars any person from doing or causing to be done, constructing, using or altering "any public sewer, main-line sewer, house lateral, sewage pumping plant, water pollution control plant, or other similar appurtenance ... without first obtaining a sewer construction permit", which section 13.14.020 reads as a permit from the city engineer.

The repair rule in full, with its sources

No rule on file here is specific to selling, buying, remodelling or adding a unit; that does not mean none exists.

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Palos Verdes Estates about the sewer lateral.

Palos Verdes Estates: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

Palos Verdes Estates writes no sewer ownership rule of its own either. Section 13.14.010 of its municipal code adopts "Title 20, Utilities, Division 2, Sanitary Sewers and Industrial Waste, of the Los Angeles County Code as amended and in effect on January 2, 2020" as the City's sanitary sewer and industrial waste ordinance, and section 13.14.020 renames the parties in it - "County engineer" means the city engineer, "County of Los Angeles" means the city of Palos Verdes Estates. Inside that adopted division, section 20.24.080 provides that all house laterals "shall be maintained by the owner of the property served in a safe and sanitary condition", and section 20.20.130 defines a "house lateral" as "that part of the sewer piping within the street or right-of-way which extends from the property or sewer right-of-way line to a construction with the main-line sewer". The length the City's ordinance puts on the owner is the length under the road.

The property owner

What else is worth knowing

Sources

Palos Verdes Estates Municipal Code chapter 13.14, Sanitary Sewers and Industrial Waste

Checked

What the rules say

Most relevant if you have a backup or blockage

No rule on file here is specific to a backup or blockage; that does not mean none exists.

Also in force here

  • Before work on the pipePermit
    Who issues it:
    City of Palos Verdes Estates - the public works director for the street, the city engineer for the sewer
    What it covers:
    excavating a street, and separately constructing, using or altering a house lateral

    Two permits reach the same trench here. Palos Verdes Estates Municipal Code section 12.12.020 provides that "no person shall make or cause to be made any excavation, cut or fill in or under the surface of any street or other public place in the city or construct, alter, or reconstruct any improvements thereon or therein without first having obtained from the public works director a permit". And the sanitary sewer ordinance the City adopted is more specific still: Los Angeles County Code section 20.32.010 bars any person from doing or causing to be done, constructing, using or altering "any public sewer, main-line sewer, house lateral, sewage pumping plant, water pollution control plant, or other similar appurtenance ... without first obtaining a sewer construction permit", which section 13.14.020 reads as a permit from the city engineer.

    What to do: Ask the public works department for the trench cut cost recovery fee and the deposits set by council resolution before accepting a quotation, and ask the city engineer separately about the sewer construction permit - they are two permits and one of them is not from the same counter. Settle with the contractor in writing who carries the two-year obligation on the road surface. If the work is a genuine emergency, section 12.12.050 allows the excavation first, but read it carefully: it must have been impractical to get a permit, the public works director must be notified and a permit obtained as soon as practicable, and the section says it "shall be strictly construed against the person claiming the benefit hereof", with the burden of proving the emergency on the person who dug.

    Checked

    Palos Verdes Estates Municipal Code chapter 12.12, Excavations

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.
  • No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.

Who governs and serves this area

Jurisdiction
Palos Verdes Estates (municipality)
Sewer service
No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.

Look up a specific address

This page describes what applies to properties in Palos Verdes Estates in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address