Skip to main content
BelowGrid

Who pays for the sewer lateral in Irvine, CA

Which part of the pipe is yours

If something’s wrong

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    City of Irvine, Chief Building Official
    What it covers:
    replacing or rearranging pipe, valves or fixtures; clearing a stoppage or repairing a leak does not

    Irvine writes down where clearing a blockage stops and permitted work begins. Section 5-9-205 replaces the plumbing code's exemption with the City's own, exempting "the clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation or replacement of water closets, sinks, garbage disposals or dishwashers, provided such work does not involve or require the replacement or rearrangement of valves, pipes or fixtures". The same section states the rule the exemption is carved out of: "permits are required for installations described in all codes adopted by reference unless specifically exempted by these codes or by the building official, in writing, for proper cause on an individual case basis".

  • Before work on the pipe · Permit

    Who issues it:
    City of Irvine, Chief Building Official
    What it covers:
    any excavation in the public right-of-way, and maintaining an encroachment in a public street

    Irvine Municipal Code section 5-10-202 provides that "any person performing any excavation, construction or involved in placement of any object, material, device over, under or across the public right-of-way or any activity performed within same, without first obtaining a permit, shall be guilty of a misdemeanor". Section 5-10-203 names who issues it: "no person shall cause, place or maintain an encroachment in a public street without having first obtained a permit to do so from the Chief Building Official". The exemptions in section 5-10-204 are for public utilities and emergencies, not for property owners.

The repair rules in full, with their sources

No rule on file here is specific to selling, buying, remodelling or adding a unit; that does not mean none exists.

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Irvine Ranch Water District about the sewer lateral.

Irvine: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

For a house, the property owner's pipe stops at the property line: Irvine Ranch Water District makes owners responsible for "sewer pipes within a building and upper sewer laterals that lead from a building to the edge of its property line", and owns and maintains the sewer pipelines beyond it, with no cleanout condition attached. In a condominium complex or a townhome development the answer is the opposite - the District's Rules put "all laterals upstream of the main line" on the owner "to maintain, repair, or reconstruct", and the District's own share starts at the main line cleanout.

Irvine Ranch Water District
The property owner

What decides which applies

Sources

Irvine Ranch Water District, Wastewater Collection & Treatment

Checked

What the rules say

Most relevant if you have a backup or blockage

No rule on file here is specific to a backup or blockage; that does not mean none exists.

Also in force here

  • Before work on the pipePermit
    Who issues it:
    City of Irvine, Chief Building Official
    What it covers:
    replacing or rearranging pipe, valves or fixtures; clearing a stoppage or repairing a leak does not

    Irvine writes down where clearing a blockage stops and permitted work begins. Section 5-9-205 replaces the plumbing code's exemption with the City's own, exempting "the clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation or replacement of water closets, sinks, garbage disposals or dishwashers, provided such work does not involve or require the replacement or rearrangement of valves, pipes or fixtures". The same section states the rule the exemption is carved out of: "permits are required for installations described in all codes adopted by reference unless specifically exempted by these codes or by the building official, in writing, for proper cause on an individual case basis".

    What to do: Ask the contractor, in writing, whether the work replaces or rearranges pipe or only clears a stoppage - section 5-9-205 turns on exactly that. If pipe is being replaced, the permit comes from the Chief Building Official, and if the work also crosses the street an encroachment permit is a separate application with its own notice period and deposit.

    In force since · Checked

    Irvine Municipal Code, Title 5 Planning, Division 9 Building Regulations, Chapter 2
  • Before work on the pipePermit
    Who issues it:
    City of Irvine, Chief Building Official
    What it covers:
    any excavation in the public right-of-way, and maintaining an encroachment in a public street

    Irvine Municipal Code section 5-10-202 provides that "any person performing any excavation, construction or involved in placement of any object, material, device over, under or across the public right-of-way or any activity performed within same, without first obtaining a permit, shall be guilty of a misdemeanor". Section 5-10-203 names who issues it: "no person shall cause, place or maintain an encroachment in a public street without having first obtained a permit to do so from the Chief Building Official". The exemptions in section 5-10-204 are for public utilities and emergencies, not for property owners.

    What to do: Establish first whether the failed length is the District's lower lateral or your own, because on a house in Irvine the District rebuilds the lower one and this permit may not arise. If it is yours and it crosses the street, allow 48 hours for the application before work can start, ask the Chief Building Official what deposit will be set, and ask whether a bond at twice the estimated cost will be required - that is a decision the City makes case by case. Section 5-10-245 requires temporary patching to be made permanent within thirty days, so confirm the contractor has priced the permanent repair and not just the backfill.

    In force since · Checked

    Irvine Municipal Code, Title 5 Planning, Division 10 Grading, Construction and Encroachment Regulations, Chapter 2 Encroachment Regulations

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.
  • No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.

Who governs and serves this area

Jurisdiction
Irvine (municipality)
Sewer service
No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.

Look up a specific address

This page describes what applies to properties in Irvine in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address