Skip to main content
BelowGrid

Who pays for the sewer lateral in Camarillo Sanitary District, CA

Which part of the pipe is yours

If something’s wrong

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    Camarillo Sanitary District
    What it covers:
    uncovering, connecting to, opening into, using, altering or disturbing a public sewer, any work on a plumbing or drainage system, and constructing a building sewer or lateral sewer

    Camarillo Sanitary District's Operations Code provides that "No one shall uncover, make any connections with or opening into, use, alter or disturb any public sewer or appurtenance or perform any work on any plumbing or drainage system without first obtaining a written permit from the District." It adds that "No person shall construct a building sewer, lateral sewer or make a connection with any public sewer without first obtaining a written permit from the District and paying all fees and connection charges as required."

The repair rule in full, with its sources

Buying or selling?

No rule on file here is specific to selling or buying; that does not mean none exists.

Who to call first about the sewer lateral

BelowGrid has no first-call guidance on file from Camarillo Sanitary District about the sewer lateral.

Camarillo Sanitary District: official site(opens in a new tab)The documents this answer is built on

Who is responsible for which part

Where Camarillo Sanitary District collects the sewage, the owner maintains the whole side sewer, from the building to the District's main. The District's Operations Code provides that "Side sewers shall be maintained by the owner of the property served thereby."

The property owner

What else is worth knowing

Sources

Camarillo Sanitary District Operations Code (adopted by Ordinance No. 7; updated through CSD Ordinance 95, adopted 14 December 2022)

Checked

What the rules say

Most relevant if you are selling or buying

No rule on file here is specific to selling or buying; that does not mean none exists.

Also in force here

  • Before work on the pipePermit
    Who issues it:
    Camarillo Sanitary District
    What it covers:
    uncovering, connecting to, opening into, using, altering or disturbing a public sewer, any work on a plumbing or drainage system, and constructing a building sewer or lateral sewer

    Camarillo Sanitary District's Operations Code provides that "No one shall uncover, make any connections with or opening into, use, alter or disturb any public sewer or appurtenance or perform any work on any plumbing or drainage system without first obtaining a written permit from the District." It adds that "No person shall construct a building sewer, lateral sewer or make a connection with any public sewer without first obtaining a written permit from the District and paying all fees and connection charges as required."

    What to do: Before working on the lateral or connecting to the District's sewer, apply to Camarillo Sanitary District for a written permit and pay its fees. Where a lateral is built or connected to a main in the street, get the encroachment permit the City of Camarillo or Ventura County requires for that location. Give the District Engineer at least two working days' notice before the work starts, and leave the trench open until the work has been inspected and approved.

    Checked

    Camarillo Sanitary District Operations Code (adopted by Ordinance No. 7; updated through CSD Ordinance 95, adopted 14 December 2022)

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.

Who governs and serves this area

Jurisdiction
Camarillo Sanitary District (special district)
Sewer service

Look up a specific address

This page describes what applies to properties in Camarillo Sanitary District in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address