Who pays for the sewer lateral in Benicia, CA
Which part of the pipe is yours
Yours from your property line to your building — if certain conditions are met
Why, and what to doNobody has put this in writing
What is known
If something’s wrong
If a repair needs a permit or an inspection
- Who issues it:
- City of Benicia - a written permit to construct a building sewer or lateral sewer or connect to a public sewer
- What it covers:
- constructing or replacing a building sewer or lateral sewer, and any connection with a public sewer
Benicia Municipal Code section 13.60.010 provides that "No person may construct a building sewer or lateral sewer or make a connection with a public sewer without first obtaining a written permit from the city and paying all fees and connection charges."
Buying or selling?
No rule on file here is specific to selling or buying; that does not mean none exists.
Planning work?
The remodelling rule in full, with its sourcesWho to call first about the sewer lateral
Benicia: official site(opens in a new tab)The documents this answer is built on
Who is responsible for which part
Benicia takes on the street length of the lateral, but only when three conditions hold. Section 13.60.050 provides that "The owner shall maintain the building sewer and all other sewage facilities located on his property", and that "The city shall maintain lateral sewers if all of the following conditions are met" - the lateral built to City requirements and approved for maintenance, an accessible approved cleanout near the property boundary, and room to work without damaging private property.
- Benicia
- The lateral sewer - the length within the street or easement between the property line and the main - where the three conditions in section 13.60.050 are met. Section 13.44.140 defines it as "the portion of a sewer lying within a public street or easement connecting a building sewer to the main sewer".
- The property owner
- The building sewer, from the building to the property line, and everything else on the lot. Section 13.44.050 defines the building sewer as running from the building's drainage outlet "to the property line or to a private sewer disposal system".
What decides which applies
Sources
Benicia Municipal Code section 13.60.050, Maintenance generallyWhat the rules say
Most relevant if you have a backup or blockage
No rule on file here is specific to a backup or blockage; that does not mean none exists.
Also in force here
- Who issues it:
- City of Benicia - a written permit to construct a building sewer or lateral sewer or connect to a public sewer
- What it covers:
- constructing or replacing a building sewer or lateral sewer, and any connection with a public sewer
Benicia Municipal Code section 13.60.010 provides that "No person may construct a building sewer or lateral sewer or make a connection with a public sewer without first obtaining a written permit from the city and paying all fees and connection charges."
What to do: Before replacing any part of your sewer line, apply to the City for the written permit, and ask Public Works what it needs for the lateral to be approved for City maintenance - including where the cleanout must go - so the new line is built to qualify.
Benicia Municipal Code section 13.60.010, Permit requiredWhy this matters
Replacing a building sewer or lateral is constructing one, so the permit applies to replacement as well as new work - and it matters for who maintains the line afterwards. The City takes on the street length only where the lateral "is constructed in accordance with city requirements and is approved by the city for maintenance" and has an accessible cleanout within five feet of the property boundary (section 13.60.050). A replacement built under permit, to the City's standard, with that cleanout, can move the street length onto the City.
What this page cannot tell you
- No assistance or grant programme has been reviewed for this jurisdiction yet.
Who governs and serves this area
- Jurisdiction
- Benicia (municipality)
- Sewer service
How this compares to neighbouring cities
All 6 of the nearest cities draw the line somewhere else. Each authority publishes only its own rule.
Your other pipe: the water service line
The drinking water line coming into your property is a separate pipe, run by a separate authority, and who is responsible for it is decided separately. One of the two authorities does not say where its side ends, so the two answers cannot be compared here.
Who owns the water service line in BeniciaNearby cities and further reading
Look up a specific address
This page describes what applies to properties in Benicia in general. To see which authorities serve one address, and what records exist for it, search for it.
Search for an address