Who pays for the sewer lateral in Richland, WA
Which part of the pipe is yours
Yours all the way to the main under the road
Why, and what to doYours from the meter to your building — if certain conditions are met
Why, and what to do
If something’s wrong
If a repair needs a permit or an inspection
- Who issues it:
- City of Richland - permits from the city, including the city engineer's permit for work in public rights-of-way or easements
- What it covers:
- maintenance of a building sewer that requires excavation or replacement of existing sewer facilities
Richland Municipal Code section 17.16.030 provides that "Where such maintenance requires excavation or replacement of existing sewer facilities, the owner shall apply for and receive appropriate permits from the city."
Who to call first about the sewer lateral
Richland: official site(opens in a new tab)The documents this answer is built on
Who is responsible for which part
In Richland the property owner is responsible for the whole building sewer, from the building to the public sewer, including its connection to the public sewer and any part in an easement or the street. Section 17.16.030 of the Richland Municipal Code provides that "The owner of property served by a building sewer is responsible for the building sewer's connection to the public sewer, and for the entire length of the building sewer from the public sewer to the building the line serves."
- The property owner
- The building sewer and its connection to the public sewer. The same section provides that "The city assumes no responsibility for the maintenance of any building sewer lines on private property or in easements or street rights-of-way."
What else is worth knowing
Sources
Richland Municipal Code section 17.16.030What the rules say
Most relevant if you are repairing or replacing the pipe
- Who issues it:
- City of Richland - permits from the city, including the city engineer's permit for work in public rights-of-way or easements
- What it covers:
- maintenance of a building sewer that requires excavation or replacement of existing sewer facilities
Richland Municipal Code section 17.16.030 provides that "Where such maintenance requires excavation or replacement of existing sewer facilities, the owner shall apply for and receive appropriate permits from the city."
What to do: Before excavating or replacing a building sewer, apply to the City of Richland for the permits the work needs, including a permit from the city engineer for any work in the street or an easement.
Richland Municipal Code section 17.16.030Why this matters
The owner is responsible for the whole building sewer and its connection to the public sewer, including any part in the street, so digging up or replacing it is the owner's work and needs City permits first. Section 17.16.020 separately requires a permit from the city engineer before sewer work in public rights-of-way or easements or a connection to a public sewer.
What this page cannot tell you
- No assistance or grant programme has been reviewed for this jurisdiction yet.
- No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.
Who governs and serves this area
- Jurisdiction
- Richland (municipality)
- Sewer service
- No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.
The closest places BelowGrid has checked
The 4 nearest cities draw the line in the same place. Each authority publishes only its own rule.
Your other pipe: the water service line
The drinking water line coming into your property is a separate pipe, run by a separate authority, and who is responsible for it is decided separately. Your sewer lateral is yours to the main; your water line stops being yours at the meter.
Who owns the water service line in RichlandNearby cities and further reading
Look up a specific address
This page describes what applies to properties in Richland in general. To see which authorities serve one address, and what records exist for it, search for it.
Search for an address