Skip to main content
BelowGrid

Who pays for the sewer lateral in Portland, OR

Which part of the pipe is yours

  • Sewer lateral

    Yours from the curb to your building — if certain conditions are met

    Why, and what to do

If something’s wrong

Who to call first about the sewer lateral

The answer here has conditions, so it is not repeated in brief. Read who to call first, in full or look up your address.

Portland: official site(opens in a new tab)

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    City of Portland - permit under City Code chapter 17.24
    What it covers:
    work within the public right-of-way on any part of an existing sewer system that extends into it

    Portland City Code section 17.32.070 A.1 provides that if any portion of an existing sewer system extends into a public right-of-way, "the property owner must obtain a permit pursuant to Chapter 17.24 before beginning work within the right-of-way."

The repair rule in full, with its sources

No rule on file here is specific to selling, buying, remodelling or adding a unit; that does not mean none exists.

Who is responsible for which part

In Portland the City maintains the part of a public sewer lateral under a curbed City street, and the owner maintains the rest. Section 17.32.070 of the Portland City Code provides that, for a City-paved street with curbs, "the City will maintain a lateral from the sewer main to the street-side curb face nearest the property being served".

Portland
The property owner

What decides which applies

Sources

Portland City Code chapter 17.32, Public Sewer and Drainage System Permits, Connections, Maintenance, and Damage

Checked

What the rules say

Most relevant if you have a backup or blockage

No rule on file here is specific to a backup or blockage; that does not mean none exists.

Also in force here

  • Before work on the pipePermit
    Who issues it:
    City of Portland - permit under City Code chapter 17.24
    What it covers:
    work within the public right-of-way on any part of an existing sewer system that extends into it

    Portland City Code section 17.32.070 A.1 provides that if any portion of an existing sewer system extends into a public right-of-way, "the property owner must obtain a permit pursuant to Chapter 17.24 before beginning work within the right-of-way."

    What to do: Before repairing or replacing a sewer lateral where it runs under the street or sidewalk, get a City of Portland permit under City Code chapter 17.24.

    Checked

    Portland City Code chapter 17.32

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.
  • No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.

Who governs and serves this area

Jurisdiction
Portland (municipality)
Sewer service
No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.

Look up a specific address

This page describes what applies to properties in Portland in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address