Who pays for the sewer lateral in Signal Hill, CA
Which part of the pipe is yours
Yours all the way to the main under the road
Why, and what to doYours from the meter to your building
Why, and what to do
If something’s wrong
If a repair needs a permit or an inspection
- Who issues it:
- City of Signal Hill city engineer
- What it covers:
- excavating or tunnelling under any street or other public way in the city, which is where the adopted County code puts the lateral
Signal Hill Municipal Code section 12.08.020 provides that no person, other than the City's own officers and employees at work, "shall excavate in any street, avenue, court, alley, place, sidewalk, or other highway in the city without first obtaining from the city engineer or his authorized representative a written permit so to do", and section 12.08.010 defines excavation as the breaking or cutting of any street surface and "the tunneling under any street". The City's sewer ordinance, borrowed from the County, puts the house lateral under the street on the owner, so this is the permit an owner needs to reach their own pipe, whether the trench is open or tunnelled.
Who to call first about the sewer lateral
Signal Hill: official site(opens in a new tab)The documents this answer is built on
Who is responsible for which part
Signal Hill writes no sewer ownership rule of its own and borrows the County's. Section 13.06.010 of its municipal code adopts Division 2 of Title 20 of the Los Angeles County Code, "as adopted, amended and in effect on July 27, 1989", as the Sanitary Sewer and Industrial Waste Code of the city. Inside that adopted division, section 20.24.080 provides that all house laterals "shall be maintained by the owner of the property served in a safe and sanitary condition", and section 20.20.130 defines a "house lateral" as "that part of the sewer piping within the street or right-of-way which extends from the property or sewer right-of-way line to a construction with the main-line sewer". The length the City's ordinance puts on the owner is the length under the road, and the City's own answer to the question is short: "Sewer laterals are the responsibility of the property owner."
- The property owner
- The run under the street, named as such. Section 20.24.080 assigns house laterals to "the owner of the property served", and section 20.20.130 places that lateral within the street or right-of-way, from the property line to the main-line sewer. Section 20.20.220 defines the main-line sewer independently - one "in which changes in alignment and grade occur only at manholes", adding that such sewers "are generally eight inches or more in diameter" - so the owner's length ends where that pipe begins.
What else is worth knowing
Sources
Signal Hill Municipal Code section 13.06.010, Adoption of county code- Signal Hill Municipal Code section 13.06.020, Definitions
- Signal Hill Municipal Code section 13.06.030, Amendments to county code
- Los Angeles County Code chapter 20.24
- Los Angeles County Code chapter 20.20, Definitions
- City of Signal Hill, Public Works questions
- City of Signal Hill, Utilities
- Signal Hill Municipal Code section 16.12.100, Sewer connection permit
What is required
- Who issues it:
- City of Signal Hill city engineer
- What it covers:
- excavating or tunnelling under any street or other public way in the city, which is where the adopted County code puts the lateral
Signal Hill Municipal Code section 12.08.020 provides that no person, other than the City's own officers and employees at work, "shall excavate in any street, avenue, court, alley, place, sidewalk, or other highway in the city without first obtaining from the city engineer or his authorized representative a written permit so to do", and section 12.08.010 defines excavation as the breaking or cutting of any street surface and "the tunneling under any street". The City's sewer ordinance, borrowed from the County, puts the house lateral under the street on the owner, so this is the permit an owner needs to reach their own pipe, whether the trench is open or tunnelled.
What to do: Before digging in the street to reach a house lateral, apply to the Signal Hill city engineer for an excavation permit and measure the trench area, since the deposit is priced by the square foot. Keep the permit paperwork for a year after the job - the permittee answers for the patched surface for that long. If the lateral is leaking, the excavation may start first, but the permit application has to be in before the trench is backfilled.
Signal Hill Municipal Code section 12.08.020, Permit requiredWhy this matters
The deposit is set in the code rather than left to discretion. Section 12.08.070 asks for a cash deposit of "Seventy-five cents for each square foot of area of proposed excavation in or under any type of pavement or surfacing material", fifteen cents a square foot where there is no pavement, and "The minimum deposit shall be twenty-five dollars and the maximum shall be one thousand dollars"; a one thousand dollar surety bond may be posted instead. The cost that outlasts the job is in section 12.08.190: the street surface is replaced "at the sole cost and expense of the permittee, who shall maintain the same for a period of one year from the date of the completion of the work". Permit and inspection fees under section 12.08.090 are set by council resolution. For a leak, section 12.08.250 allows the dig to start first: "Should a leak occur in any pipeline laid in or near a public street, alley, or way, an excavation may be made for the purpose of repairing the pipeline without first obtaining an excavation permit from the city engineer", with the permit applied for "as soon as is practicable thereafter and in any event before any backfilling is done".
- Signal Hill Municipal Code section 12.08.010, Definitions
- Signal Hill Municipal Code section 12.08.070, Permit
- Signal Hill Municipal Code section 12.08.090, Permit and inspection fees
- Signal Hill Municipal Code section 12.08.190, Surface restoration and maintenance
- Signal Hill Municipal Code section 12.08.250, Emergency repairs
- Signal Hill Municipal Code section 13.06.010
What this page cannot tell you
- No assistance or grant programme has been reviewed for this jurisdiction yet.
- No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.
Who governs and serves this area
- Jurisdiction
- Signal Hill (municipality)
- Sewer service
- No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.
How this compares to neighbouring cities
1 of the 8 nearest cities draws the line somewhere else. Each authority publishes only its own rule.
Your other pipe: the water service line
The drinking water line coming into your property is a separate pipe, run by a separate authority, and who is responsible for it is decided separately. Your sewer lateral is yours to the main; your water line stops being yours at the meter.
Who owns the water service line in Signal HillNearby cities and further reading
Look up a specific address
This page describes what applies to properties in Signal Hill in general. To see which authorities serve one address, and what records exist for it, search for it.
Search for an address