Skip to main content
BelowGrid

Who pays for the sewer lateral in Bakersfield, CA

Which part of the pipe is yours

If something’s wrong

Who to call first about the sewer lateral

City of Bakersfield sewer maintenance staff 661-326-3111

When to call: an emergency sewer stoppage

What happens: sewer stoppages are cleared on the City main line only; the lateral is the owner's

Hours, after-hours and sources
Bakersfield: official site(opens in a new tab)

If a repair needs a permit or an inspection

  • Before work on the pipe · Permit

    Who issues it:
    City of Bakersfield, the city engineer approving and the city issuing the sewer permit
    What it covers:
    any person desiring to connect to a sewer of the city, with direct attachment of a sewer six inches or smaller permitted only after the permit is obtained and the fees paid

    Bakersfield requires a sewer permit and the city engineer's approval before anything is attached to a city sewer: "any person desiring to connect to a sewer of the city shall obtain a sewer permit", and "a sewer permit will not be issued unless the applicant has first obtained approval from the city engineer". For an ordinary house connection the code is explicit about the sequence - "direct attachment of a sewer six inches or smaller in diameter to a city sewer will be made only after the connection permit and wastewater discharge permit, if required, are obtained and all required fees are paid by the applicant". Separately, section 14.12.195 offers an alternative to hiring anyone: at a property owner's request "the city will repair that portion of the house connection sewer between the improved city right-of-way and the public sewer for a fee to be determined on a time and materials basis".

The repair rule in full, with its sources

Buying or selling?

No rule on file here is specific to selling or buying; that does not mean none exists.

Who is responsible for which part

The house connection sewer is the owner's all the way to the public sewer - but Bakersfield will do the hard half for you if you ask. Section 14.12.195 commits the City to repairing "that portion of the house connection sewer between the improved city right-of-way and the public sewer for a fee to be determined on a time and materials basis". The City will do the work; the cost is yours, and it is not published.

The property owner

What else is worth knowing

Sources

Bakersfield Municipal Code, Title 14 chapter 14.12, Sewers

Checked

What is required

  • Before work on the pipePermit
    Who issues it:
    City of Bakersfield, the city engineer approving and the city issuing the sewer permit
    What it covers:
    any person desiring to connect to a sewer of the city, with direct attachment of a sewer six inches or smaller permitted only after the permit is obtained and the fees paid

    Bakersfield requires a sewer permit and the city engineer's approval before anything is attached to a city sewer: "any person desiring to connect to a sewer of the city shall obtain a sewer permit", and "a sewer permit will not be issued unless the applicant has first obtained approval from the city engineer". For an ordinary house connection the code is explicit about the sequence - "direct attachment of a sewer six inches or smaller in diameter to a city sewer will be made only after the connection permit and wastewater discharge permit, if required, are obtained and all required fees are paid by the applicant". Separately, section 14.12.195 offers an alternative to hiring anyone: at a property owner's request "the city will repair that portion of the house connection sewer between the improved city right-of-way and the public sewer for a fee to be determined on a time and materials basis".

    What to do: Decide first who is doing the work. If you want the City to repair the run between the improved right-of-way and the main, ask Public Works for an estimate of the time and materials before you agree, and get a contractor's figure for the same length so you have something to compare it with. If you are hiring a contractor, get the city engineer's approval before the permit application and expect to pay the fees before anything is attached to the city sewer - the code makes payment a precondition of attachment, not a bill afterwards. Use the words "house connection sewer" rather than "lateral" when you ring: in this code a lateral is the City's pipe.

    Checked

    Bakersfield Municipal Code, Title 14 chapter 14.12, Sewers

What this page cannot tell you

  • No assistance or grant programme has been reviewed for this jurisdiction yet.
  • No sewer service territory has been mapped for this area, so BelowGrid cannot say who serves an individual address.

Who governs and serves this area

Jurisdiction
Bakersfield (municipality)
Sewer service
No map of sewer providers is held here. BelowGrid cannot say which sewer provider serves an individual address.

Look up a specific address

This page describes what applies to properties in Bakersfield in general. To see which authorities serve one address, and what records exist for it, search for it.

Search for an address